PMP考試每天一練-2019年P(guān)MP考試試題112
|
PMP考試試題一: A project manager develops a list of project risks by sending a questionnaire to subject matter experts (SMEs) to solicit ideas. After several rounds of reviews of the anonymous responses by the SMEs, a consensus is reached on the most important project risks. This is an example of which tool or technique? A. Joint application design/development (JAD) B. Multicriteria decision analysis C. Delphi D. Expert judgment 項(xiàng)目經(jīng)理通過(guò)向主題專(zhuān)家(SMB)發(fā)送問(wèn)卷征求意見(jiàn)的方式,制定項(xiàng)目風(fēng)險(xiǎn)清單。經(jīng)過(guò)幾輪對(duì)主題專(zhuān)家匿名答復(fù)的審查,對(duì)最重要的項(xiàng)目風(fēng)險(xiǎn)達(dá)成一致意見(jiàn)。這屬于哪一種工具或技術(shù)的實(shí)例? A.聯(lián)合應(yīng)用設(shè)計(jì)開(kāi)發(fā)(JAD) B.多標(biāo)準(zhǔn)決策分析 C.德?tīng)柗萍夹g(shù) D.專(zhuān)家判斷 PMP答案解析:匿名多輪達(dá)成一致意見(jiàn)符合德?tīng)柗萍夹g(shù)方法的特點(diǎn)。 PMP參考答案:C PMP考試試題二 When scheduling a project, the project manager has enough information to detail the project's first phase. At the start of the project's execution, the project manager assumes that detailed schedules for the next phases will be created after more information is available.Which scheduling technique is the project manager using? A. Iterative life cycle B. Decompositon C. Rolling wave planning D. Adaptive life cycle 制定項(xiàng)目的進(jìn)度計(jì)劃時(shí),項(xiàng)目經(jīng)理?yè)碛凶銐虻男畔ⅲ瑏?lái)詳細(xì)說(shuō)明項(xiàng)目第一階段進(jìn)度計(jì)劃。在開(kāi)始項(xiàng)目執(zhí)行時(shí),項(xiàng)目經(jīng)理認(rèn)為在獲得更多信息后將制定下一階段的詳細(xì)進(jìn)度計(jì)劃。項(xiàng)目經(jīng)理采用了哪一項(xiàng)進(jìn)度安排技術(shù)? A.迭代生命周期 B.分解 C.滾動(dòng)式規(guī)劃 D.適應(yīng)性生命周期 PMP答案解析:近期制定的詳細(xì),未來(lái)遠(yuǎn)期制定的粗略。 PMP參考答案:C |