1 The Cost Performance Index (CPI) measures

  A total costs

  B performance over a period of time

  C costs at a point of time

  D variable costs

  E All of the above.

  ans:C

  2 Parametric cost estimating involves

  A using the WBS to do bottom up estimates

  B defining the perimeters of the life-cycle

  C calculating the individual estimates of work packages

  D using a statistical model to estimate costs

  E A and C

  ans:D

  3 Which of the statements regarding benefit-cost analysis in the Special window are true?

  A 1 and 2

  B 2 and 3

  C 1 and 3

  D 1, 2 and 3

  E None of the above.

  ans:C

  4 Present value measures

  A the value to us today of future cash flows.

  B the rate of return on an investment when we take account of cash inflows and outflows

  C the current estimates of our project budget

  D the dollars worth of work accomplished as of today

  E All of the above.

  ans:A

  5 Using the situation stated in the Special window, what is the cost performance index for Case #9?

  A 1.1

  B 1.91

  C 0.83

  D 1.2

  E None of the above

  ans:A

  6 Sunk costs are:

  A future costs held in reserve.

  B costs invested in commodities.

  C expended costs over which we have no control.

  D expended costs over which we have no more control

  E tax credits

  ans:D

  7 Managerial Reserves are:

  A allowances to account for price changes that can occur over the life of a project.

  B incentive fees paid to managers for good performance.

  C funds used to offset poor cost or schedule estimates.

  D accounts to allocate and maintain funds for contingency programs

  E All of the above.

  ans:D

  8 Life Cycle Costing:

  A is the concept of including all costs within the total life of a project.

  B is an activity devoted to optimizing cost/performance

  C is an activity of appraising the cost and technical performance of a completed project.

  D is a process of predicting the life of a project.

  E None of the above.

  ans:A

  9 Using the situation stated in the Special window, what is the schedule variance for Case #8?

  A 1000

  B 2000

  C -1000

  D -2000

  E 0

  ans:C

  10 Using the situation stated in the Special window, what is the cost variance for Case #9?

  A $-1,000

  B $1,000

  C -2000

  D 2000

  ans:B

  11 Using the situation stated in the Special window, what is present value of $1000 at 12% at the end of 5 years?

  A $3,605.00

  B $0.57

  C $567.00

  D $892.86

  E $3.61

  ans:C

  12 Using the situation stated in the Special window, what is net present value of an annual income flow of $1600 at 14% over the next three years?

  A $3,713.60

  B $0.68

  C $1,080.00

  D $476.19

  E $2.32

  ans:A

  13 Using the situation stated in the Special window, what is the labor rate cost variance?

  A $5,500.00

  B $1,500.00

  C $-100.00

  D $-0.10

  E $5,600.00

  ans:D

  14 Using the situation stated in the Special window, what is the total price variance for direct material?

  A $140.00

  B $736.00

  C $0.02

  D $-350.00

  E $5,850.00

  ans:B

  15 Using the situation stated in the Special window, what is the total variable costs for producing one widget?

  A $1,020

  B $1,010

  C $1,015

  D $20

  E None of the above.

  ans:E

  16 A technique that can be used to measure the total income of a project compared to the total moneys expended at any period of time is:

  A return on investment (ROI)

  B net present value (NPV)

  C discounted cash flow (DCF)

  D B and C

  E All of the above.

  ans:E

  17 Cost management includes processes that are required to maintain financial control of projects. These processes may include:

  A economic evaluation

  B cost estimating

  C cost forecasting

  D B and C

  E All of the above.

  ans:E

  18 Which of the following is considered a method of accelerated depreciation:

  A sum-of-the-years digit

  B straight-line

  C double-declining-balance

  D A and C

  E All of the above.

  ans:D

  19 The Cost Performance Index is computed as:

  A budget cost of work performed divided by actual cost of work performed

  B budget cost of work performed minus actual cost of work performed

  C budget cost of work performed minus budget cost of work scheduled

  D budget cost of work scheduled divided by budget cost of work performed

  E actual cost of work scheduled divided by budget cost of work performed

  ans:A

  20 A budget estimate should give the manager cost data accurate to within:

  A -5 to +10 percent of actual cost

  B -25 to +75 percent of actual cost

  C -30 to +75 percent of actual cost

  D -10 to +25 percent of actual cost

  E None of the above

  ans:D

日韩精品一区二区三区三区免费_欧美理论片在线_久久精品人人做人人爽97 _欧美日韩亚洲视频

PMP團購導航
遠程PMP團購
北京PMP團購
上海PMP團購
廣州PMP團購
深圳PMP團購
江浙PMP團購
西部PMP團購
其他城市團購



PMP題庫
主站蜘蛛池模板: 国产精品久久精品| 日本高清视频一区二区三区 | 久久天天躁狠狠躁夜夜爽蜜月| 宅男在线精品国产免费观看| 日韩欧美一区二区视频在线播放V| 久久av一区二区| 91精品久久久久久久久久久久久久| 美日韩精品视频免费看| 国产一区视频在线播放| 日本欧美国产在线| 日本精品一区二区三区高清 久久| 国产精品一区二区不卡视频| 国产成人av在线播放| 久久国产精品精品国产色婷婷| 国产日韩第一页v| 亚洲欧洲日韩精品| 日本精品一区二区三区在线| 国产成人精品日本亚洲专区61| 成人国产精品久久久久久亚洲| 日韩av成人在线| 日韩欧美亚洲精品| 久久精品视频在线观看| 不卡av日日日| 国产欧美日韩小视频| 色老头一区二区三区在线观看| 91精品国产高清久久久久久91| 国产九九精品视频| 青青久久av北条麻妃海外网| 亚洲国产日韩美| 欧美日本精品在线| 久久亚洲精品网站| 天天综合中文字幕| 久久99精品久久久久久青青日本| 91久久久久久| 婷婷亚洲婷婷综合色香五月 | 欧美中文字幕视频| 亚洲欧美精品在线观看| 久久韩国免费视频| 国产精品久久久影院| 日本成人在线不卡| 在线不卡日本|