1. project life cycles provide a better means of measurement of progress and control. the four phases of a project are conceptual development,

  _____, _____, and _____.

  a. preliminary planning, detail planning, closeout

  b. implementation, reporting, termination

  c. development, implementation, termination

  d. execution, reporting, finishing

  e. implementation, termination, post-audit review

  ans: c

  2. response planning is the responsibility of the functional areas and considers

  a. mitigation.

  b. deflection.

  c. contingency planning.

  d. unforeseen occurrences.

  e. all of the above.

  ans: e

  3. the definitive terms of a contract are written during which of the following contract phases?

  a. contract phase

  b. post-award phase

  c. award phase

  d. pre-award phase

  e. requirement phase

  ans: c

  4. the sending or conveying of information from one place to another is the process of

  a. networking

  b. transmitting

  c. interacting

  d. promoting

  e. interfacing

  ans: b

  5. which of the following types of cost are relevant to making financial decisions:

  a. sunk cost

  b. opportunity cost

  c. material cost

  d. a and c only

  e. b and c only

  ans: e

  6. in preparing a good project definition, experienced project managers will:

  a. concentrate mainly on the end product rather than costs or benefits. these come later.

  b. realize that only the “tip of the iceberg” may be showing. as a project manager, you must get beneath it.

  c. understand that a project definition/plan is a dynamic rather than static tool, and thus subject to change.

  d. try to convert objectives into quantifiable terms.

  e. all of the above

  ans: e

  7. in which of the following is the cost of risk hidden by the contractor?

  a. firm fixed price contract

  b. fixed price plus incentive

  c. cost plus fixed price

  d. cost plus percentage of cost

  e. a and b

  ans: d

  8. management of a certain building was receiving complaints about slow elevator service. the solution adopted was to add mirrors in the

  lobbies to reduce boredom while passengers waited. this is an example of _____ .

  a. kepner-tregoe method

  b. potential problem analysis

  c. decision analysis

  d. creative problem solving

  e. none of the above

  ans: d

  9. pure risk differs from business risks because pure risk's _____ .

  a. include chances of both profit or loss associated with the business.

  b. include chances of loss and no chances for profit associated with the business.

  c. must incur personal loss with business liability.

  d. must incur business liability associated with loss of pure profit.

  e. b and c

  ans: b

  10. the actual configuration of a pert/cpm network _____ the amount of resources that can be devoted to the project.

  a. increases.

  b. is not affected by

  c. does not require

  d. is heavily dependent upon

  e. is the only means of determining

  ans: d

  11. the following types of costs are relevant to making a financial decision except:

  a. opportunity costs

  b. direct costs

  c. sunk cost

  d. unavoidable costs

  e. none of the above

  ans: c

  12. the standard types of communication include all but

  a. written

  b. verbal

  c. telepathic

  d. nonverbal

  e. none of the above

  ans: c

  13. _____ of the extra costs of the project can often be attributed to a lack of quality.

  a. 0.12

  b. 0.15

  c. 0.2

  d. 0.25

  e. less than 10%

  ans: c

  14. a budget estimate should give the manager cost data accurate to within:

  a. -5 to +10 percent of actual cost

  b. -25 to +75 percent of actual cost

  c. -30 to +75 percent of actual cost

  d. -10 to +25 percent of actual cost

  e. none of the above

  ans: d

網(wǎng)站sitemap

日韩精品一区二区三区三区免费_欧美理论片在线_久久精品人人做人人爽97 _欧美日韩亚洲视频

PMP團(tuán)購(gòu)導(dǎo)航
遠(yuǎn)程PMP團(tuán)購(gòu)
北京PMP團(tuán)購(gòu)
上海PMP團(tuán)購(gòu)
廣州PMP團(tuán)購(gòu)
深圳PMP團(tuán)購(gòu)
江浙PMP團(tuán)購(gòu)
西部PMP團(tuán)購(gòu)
其他城市團(tuán)購(gòu)



PMP題庫(kù)
主站蜘蛛池模板: 91精品国产91久久久| 国产精品麻豆免费版| 国产精品美腿一区在线看| 日韩欧美国产免费| 日本不卡在线观看| 亚洲欧洲精品在线| 欧美激情精品久久久久久黑人| 国产精品一区二区免费看| 91久久精品国产91性色| 国产成人久久精品| 久久伊人色综合| 国产精品久久久久久久久粉嫩av| 五月婷婷综合色| 99国产在线观看| 久久久久亚洲av无码专区喷水| 日本视频一区二区不卡| 99热亚洲精品| 久久在线精品视频| 亚洲综合五月天| 欧美激情亚洲自拍| 欧美中文字幕在线| 欧美亚洲另类久久综合| 国产精品视频久久久久| 91久久久久久久久久久久久| 欧美久久综合性欧美| 国产精品网站免费| 久久精品99国产| 欧美在线视频二区| 欧美一区少妇| www国产亚洲精品| 国产九色精品| 亚洲国产一区二区三区在线播 | 欧美激情亚洲自拍| 国产精品亚洲a| 国产成人亚洲综合青青| 久久天天躁狠狠躁夜夜爽蜜月| 国产欧美日韩视频| 国产精品午夜视频| 伊人婷婷久久| 国产精品久久久久久av下载红粉| 欧美一乱一性一交一视频|