PMP認(rèn)證考試練習(xí)題(一)(中英文)

轉(zhuǎn)載者:PMP團(tuán)購網(wǎng)      發(fā)布時間:2012/5/28        點擊: 4403

1. Buyers use a variety of methods to provide incentives to a seller to complete work early or within certain contractually specified time frames. One such incentive is the use of liquidated damages. From the seller's perspective, liquidated damages are what form of incentive?
a. Positive
b. Negative
c. Nomi
d. Reverse
e. Risk-prone
買主使用各種方法以使承包商更早的或在某些契約指定時間框架內(nèi)完成工作。一種方式是清算賠償金的應(yīng)用,從承包商的觀點看,清算賠償金是那一種類型的激勵?
a. 積極地
b. 消極地
c. 輕微地
d. 反面地
e. 風(fēng)險傾向地
2. Payment bonds are often required by the contract and require specific actions under the stated conditions. Payment bonds are specifically designed to ensure that the prime contractor provides payment of-
a. Insurance premiums
b. Weekly payrolls
c. Incremental earnec
d. Subcontractors, laborers, and suppliers of material
e. Damages for accidents caused
在合同中通常需要付款保函,同時在所陳述的情況下需要采取特別措施。付款保函是專門用于保證為主要承包商提供什么樣的付款-
a. 保險費
b. 每周的薪水
c. 增加所得
d. 轉(zhuǎn)包商、勞動力和原料供應(yīng)l
e. 意外事故造成的損失
3. When a seller breaches a contract, the buyer cannot receive-
a. Compensatory damages
b. Punitive damages
c. Specific performance
d. Liquidated damages
e. All the above
當(dāng)承包商違反合同,購買者不能得到-
a. 補(bǔ)償性的賠償金
b. 懲罰性的賠償金
c. 特殊的執(zhí)行
d. 清算賠償金
e. 上述所有
4. The contracting function in an organization is considered to be decentralized when-
a. Each project manager has control over the contracting process for his or her project
b. The project manager controls contract award
c. The contracting person appointed to the project is available and under the project manager's direct control
d. Contracting is tailored to a single project
e. All above
在什么時候,組織內(nèi)合同的功能可以被分散考慮-
a. 每個項目經(jīng)理都他的/她的項目的合同程序
b. 項目經(jīng)理控制著合同的獎勵
c. 在項目經(jīng)理的直接領(lǐng)導(dǎo)下,可用指定的項目合同人
d. 合同針對單個項目
e. 上述所有
5. Which of the following terms represents a contract type category?
a. Fixed-price
b. Cost-reimbursement
c. Unit-price
d. a & b
e. a, b, & c
下列那一個描述了合同的類型?
a. 固定價
b. 成本補(bǔ)償
c. 單元價
d. a 和 b
e. a, b, 和 c
6. Which item is not a basic element of a contract?
a. Offer
b. Acceptance
c. Consideration
d. Pricing structure
e. Legality of purpose
下列那一個不是合同的基本的因素?
a. 出價
b. 接受
c. 報酬
d. 價格結(jié)構(gòu)
e. 有意圖的法律責(zé)任
7. Three techniques used for procurement planning are-
a. Make-or -buy analysis, expert judgment, and contract type selection
b. Fixed-price, cost-reimbursement, and unit-price contracts
c. Cost and schedule estimates, invoice processing, and cash flow projections
d. Scope statement, change management, and marketing analysis
e. Contract type selection, negotiation, and cash flow projections
用于采購計劃編制的三種技能是-
a. 制造或購買的分析,專家判斷和合同類型的選擇
b. 固定價、成本補(bǔ)償和單元價
c. 成本和進(jìn)度預(yù)計、發(fā)票處理和現(xiàn)金流推算
d. 范圍描述、變更管理和市場分析
e. 合同類型選擇、談判和現(xiàn)金流推算
8. A buyer has negotiated a fixed-price incentive contract with the seller. The contract has a target cost of $200,000, a target profit of $30,000,and a target price of $230,000. The buyer has also negotiated a ceiling price of $270,000 and a share ratio of 70/30. If the seller completes the contract with actual costs of $170,000, how much profit will the buyer pay the seller?
a.$21,000
b.$30,000
c.$35,000
d.$39,000
e.$51,000
買主正同承包商談一個固定價加獎勵的合同。合同的目標(biāo)成本是$200,000,目標(biāo)利潤是$30,000,目標(biāo)價是$230,000。買主也規(guī)定了最高價是$270,000共享比例是70/30。如果承包商完成合同時實際成本是$170,000,買主要付承包商多少利潤?
a.$21,000
b.$30,000
c.$35,000
d.$39,000
e.$51,000
9. Contracts may be written in any form that is understandable and enforceable, so project personnel often attempt to be "creative" in developing the contract's terms and conditions. If all the following options are available, the best course of action to meet the requirements of the project is to-
a. Preqare unique terms and conditions
b. Tailor an existing contract
c. Use standard clauses whenever possible
d. Avoid using contractual documents
e. None of the above
合同可能用可以理解的和強(qiáng)制的形式書寫,所以項目人員常常試圖使用“創(chuàng)造性”完善合同的條款和條件。如果下列所有的選擇可用,滿足項目的最好的行動方針是-
a. 準(zhǔn)備獨特的條款和條件
b. 適用一個現(xiàn)有的合同
c. 只要有可能就使用標(biāo)準(zhǔn)條款
d. 避免使用合同文件
e. 上述都不是
10. When costs increase because of changes in the scope of work, the project is experiencing-
a. Accelerated costs
b. Cost growth
c. Cost escalation
d. Cost overrun
e. Cost risk
當(dāng)成本由于工作范圍的變更而增加時,此項目正經(jīng)歷-
a. 加速的成本
b. 成本增加
c. 成本擴(kuò)大
d. 成本超支
e. 成本風(fēng)險

網(wǎng)站sitemap

日韩精品一区二区三区三区免费_欧美理论片在线_久久精品人人做人人爽97 _欧美日韩亚洲视频

PMP團(tuán)購導(dǎo)航
遠(yuǎn)程PMP團(tuán)購
北京PMP團(tuán)購
上海PMP團(tuán)購
廣州PMP團(tuán)購
深圳PMP團(tuán)購
江浙PMP團(tuán)購
西部PMP團(tuán)購
其他城市團(tuán)購



PMP題庫
主站蜘蛛池模板: 日韩福利视频| 日韩免费观看视频| 久久久久久久91| 欧美中文字幕精品| 久久国产精品网站| 国产精品视频久久久| 午夜精品一区二区三区在线播放| 国产精品综合网站| 国产一区玩具在线观看| 伊人色综合久久天天五月婷 | 日本不卡视频在线播放| 国产精品青草久久久久福利99| 久久久久久久久久久国产| 国产精品午夜视频| 久久艹中文字幕| 日韩中文字幕av在线| 午夜精品一区二区三区在线播放| 日日噜噜噜夜夜爽亚洲精品| 久久福利视频网| 欧美激情网友自拍| 国产日韩欧美在线观看| 狠狠色狠狠色综合人人| 久久精品国产精品国产精品污| 精品产品国产在线不卡| 国产精品美女视频网站| 天天综合五月天| 欧美亚洲国产视频小说| 日韩一级黄色av| 久久久久久久久91| 欧美亚洲另类在线| 日韩最新av在线| 一区二区三区在线视频看| 日韩欧美一级在线| 中文字幕在线亚洲精品| 日韩无套无码精品| 国产一区视频免费观看| 一区二区在线高清视频| 亚洲狠狠婷婷综合久久久 | 中文字幕在线亚洲精品| 欧美日韩一区二区三区在线观看免| 久久精品人人做人人爽电影|