PMP考試每天一練-2019年P(guān)MP考試試題135
|
PMP考試試題一: Two project team members consistently disagree and criticize each other during team meetings, which negatively affects the team. What should the project manager do? A. Meet with these team members to help them find common ground. B. Take no action, since this is not affecting the project's cost or schedule. C. Initiate a team-building exercise for the project team. D. Reassign one of these team members to another project. 兩名項(xiàng)目組成員一直持有不同意見(jiàn),并在團(tuán)隊(duì)會(huì)議上批評(píng)對(duì)方,對(duì)團(tuán)隊(duì)產(chǎn)生負(fù)面影響。項(xiàng)目經(jīng)理應(yīng)該怎么做? A.與這兩名團(tuán)隊(duì)成員開(kāi)會(huì),幫助他們找到共同點(diǎn)。 B.不采取任何行動(dòng),因?yàn)檫@是不影響項(xiàng)目的成本或進(jìn)度。 C.為項(xiàng)目團(tuán)隊(duì)發(fā)起一項(xiàng)團(tuán)隊(duì)建設(shè)練習(xí)。 D. 將其中一名團(tuán)隊(duì)成員重新分配到另一個(gè)項(xiàng)目 PMP答案解析:四個(gè)選項(xiàng)中A為最優(yōu)選項(xiàng)。 PMP參考答案:A PMP考試試題二 During a new system deployment, a company plans quality management. Which of the following quality control activities should be included in this process? A. Audit the technical requirements for the system's specifications B. Perform a process analysis to identify issues and plan preventive actions C. Produce a checklist to verify that a set of required steps were performed D. Examine whether the team is using best practices throughout the project 在一個(gè)新系統(tǒng)部署期間,公司制定質(zhì)量管理計(jì)劃,下列哪一個(gè)質(zhì)量控制活動(dòng)應(yīng)包含在這個(gè)過(guò)程中? A.審計(jì)系統(tǒng)技術(shù)規(guī)范的技術(shù)要求 B.執(zhí)行過(guò)程分析,識(shí)別問(wèn)題并計(jì)劃預(yù)防措施 C.制作一份核對(duì)表,核實(shí)已執(zhí)行一系列必要的措施 D.檢查團(tuán)隊(duì)在項(xiàng)目過(guò)程中是否使用最佳實(shí)踐 PMP答案解析:A是質(zhì)量控制,BCD都是質(zhì)量保證。 PMP參考答案:A |