PMP考試每天一練-2019年PMP考試試題10
|
PMP考試試題一: A buyer and seller sign a contract statement of work. The seller completes the work as specified in the contract; however, the buyer is not satisfied with the results.What is the status of the contract? A.Incomplete B.Waived C.Complete D.Null and void 買方和賣方簽署了一份合同工作說明書,賣方按合同規定完成工作。然而,買方卻對工作結果不滿意。合同狀態是什么? A.未完成 B.放棄 c.完成 D.無效 PMP答案解析:賣方已按合同規定完成了工作,只是買方主觀上不滿意 PMP參考答案:C PMP考試試題二 A manufacturing project is under schedule constraints. At the time of delivery, a shipment of components is cancelled, because the components do not meet minimum requirements. In the project management plan, this was identified as a potential liability.The project manager should do which of the following? A.Refer to the quality management plan and verify whether the quality metrics are appropriate B.Survey the industry standards and enterprise environmental factors C.Review the project management plan to create a more realistic schedule D.Review and follow up on the execution of the planned risk responses 一個制造項目處于進度制約之下。交付時,一大批部件被廢棄,因為這些部件未滿足最低要求。在項目管理計劃中,這被識別為一個潛在責任。項目經理應該采取下列那種措施? A.參考質量管理計劃并確認質量指標是否適合 B.研究行業標準和事業環境因素 C.審查項目管理計劃以創建更現實的進度計劃 D.審查并跟蹤計劃風險應對措施的執行 PMP答案解析:a potential liability翻譯為潛在的責任、潛在的傾向,可理解為風險 PMP參考答案:D |