PMP考試每天一練--PMP考試試題120
|
PMP考試試題一: What is the main objective of the Executing Process group? A. Tracking and reviewing the progress of the project B. Managing stakeholder expectations C. Satisfying the project specifications D. Monitoring the schedule 執行過程組的主要目標是什么? A. 跟蹤并審查項目進度 B. 管理利害關系者的期望 C. 滿足項目規范 D. 監控進度表 PMP參考答案:C. 滿足項目規范 PMP答案解析:項目整合管理--執行過程組引言(4.3)P80 PMP考試試題二: During a routine walkthrough, you discover that a seller has neglected to properly produce a major component of a deliverable. The seller tells you that the component is not included in the contract. What should you do FIRST? A. Insist that the seller follow his quality assurance plans. B. Send a letter to the seller insisting that the contract be adhered to. C. Determine if the seller is correct, and whether the component could be reasonably considered part of the contract. D. Inform the project sponsor of the discrepancy. 在例行檢查中,你發現一賣方漏做了某一可交付成果中一個關鍵零件。賣方告訴你說合同中不包括這個零件。你首先應該怎么做? A. 堅持賣方遵循他的質量保證計劃。 B. 給賣方發封信件,要求他們遵守合同。 C. 確定賣方的說法是否正確。 D. 將此事告訴給項目發起人。 審題: 此題的關鍵字為“賣方說合同中不包括這個零件”,所以首先要明確這個說法是不是準確,才能確定下一步怎么做。 定位: 監控過程組·控制采購·檢查和審計 解析: 1、雖然采購管理員可以是項目團隊成員,但他通常向另一部門的經理報告。題干中說賣方告訴你說合同中不包括你經檢查發現的賣方漏做的某一可交付成果中一個關鍵零件,所以你首先要對采購進行檢查和審計,確定賣方說法是否正確,因此選項C為正確選項; 2、選項A是質量管理的內容,與題干要求無直接關系,所以不對; 3、選項B是在檢查和審計后才酌情考慮需采取的措施,而不應該首先去做,因此選項B不正確; 4、在真實情況弄清楚前,不應告訴項目發起人,因此選項D也不對。 PMP參考答案:C. 確定賣方的說法是否正確。 |