PMP考試每天一練--PMP考試試題119
|
PMP考試試題一: Two days before a project’s delivery date. The project sponsor wants to verify that all deliverable meet the business objectives, and that all the changes were applied throughout the project life cycle. The project manager knows that the project has been well documented from the beginning. What should the project manager provide to sponsor? A. All versions of the project management plan B. Requirement traceability matrix C. Project scope statement D. copy of the project charter 項(xiàng)目交付日期前兩天,項(xiàng)目發(fā)起人希望核實(shí)是否所有可交付成果均滿足業(yè)務(wù)目標(biāo)以及在項(xiàng)目生命周期過程中是否已應(yīng)用所有變更。項(xiàng)目經(jīng)理從開始就知道文檔齊全。項(xiàng)目經(jīng)理應(yīng)該向項(xiàng)目發(fā)起人提供什么文件? A. 項(xiàng)目管理計(jì)劃的所有版本 B. 需求跟蹤矩陣 C. 項(xiàng)目范圍說明書 D. 項(xiàng)目章程副本 PMP參考答案:B. 需求跟蹤矩陣 PMP答案解析:收集需求輸出-需求跟蹤矩陣(5.2.3.2)P117 PMP考試試題二: Management wants to be sure that the project is following defined quality standards. Which of the following should they look at? A. Risk management plan. B. WBS. C. Statement of work. D. Quality audit. 管理層希望項(xiàng)目嚴(yán)格遵守定義好的質(zhì)量標(biāo)準(zhǔn),他們應(yīng)該查看以下哪項(xiàng)內(nèi)容? A.風(fēng)險(xiǎn)管理計(jì)劃。 B.工作分解結(jié)構(gòu)。 C.工作說明書。 D.質(zhì)量審計(jì)。 審題: 此題的關(guān)鍵字為“項(xiàng)目嚴(yán)格遵守定義好的質(zhì)量標(biāo)準(zhǔn)”。 定位: 執(zhí)行過程組·實(shí)施質(zhì)量保證·質(zhì)量審計(jì) 解析: 1、題干中說管理層希望項(xiàng)目嚴(yán)格遵守定義好的質(zhì)量標(biāo)準(zhǔn),質(zhì)量審計(jì)報(bào)告中包含了確定項(xiàng)目活動(dòng)是否遵循組織和項(xiàng)目的質(zhì)量標(biāo)準(zhǔn),所以D為正確答案; 2、風(fēng)險(xiǎn)管理計(jì)劃描述將如何安排與實(shí)施項(xiàng)目風(fēng)險(xiǎn)管理,它是項(xiàng)目管理計(jì)劃的子計(jì)劃,包括方法論、角色與職責(zé)、預(yù)算、時(shí)間安排、風(fēng)險(xiǎn)類別和風(fēng)險(xiǎn)概率和影響的定義,所以答案A與題干所述無關(guān); 3、工作分解結(jié)構(gòu)是把項(xiàng)目可交付成果和項(xiàng)目工作分解成較小、更易于管理的組成部分,所以答案B也不對(duì); 4、工作說明書是對(duì)項(xiàng)目可交付產(chǎn)品或服務(wù)的敘述性說明,所以答案C也不對(duì)。 PMP參考答案:D.質(zhì)量審計(jì)。 |




