PMP考試每天一練--PMP考試試題113
|
PMP考試試題一: Buyers use a variety of methods to provide incentives to a seller to complete work early or within certain contractually specified time frames. One such incentive is the use of liquidated damages. From the seller’s perspective, liquidated damages are what form of incentive? A. Positive B. Negative C. Nominal D. Risk-prone 買方利用許多方法激勵賣方盡早完成或者按照合同規(guī)定的時間表完成項目工作。其中一個方法是清償損失額。從賣方的角度看,清償損失額是什么形式的激勵: A. 積極 B. 消極 C. 名義上的 D. 造成風(fēng)險的 PMP參考答案:B. 消極 PMP答案解析:激勵方式 PMP考試試題二: The testing results for a new computer modulation project indicate a problem with the onboard computer’s sensors. The project manager calls a meeting with the team to analyze the problem. The project manager is involved in: A. Quality management. B. Perform Quality Assurance. C. Plan Quality Management D. Quality Control. 一款新型計算機(jī)調(diào)制解調(diào)器的測試結(jié)果表明,便攜的計算機(jī)傳感器出了問題。項目經(jīng)理召集團(tuán)隊成員開會討論。項目經(jīng)理正在實施: A.質(zhì)量管理。 B.實施質(zhì)量保證。 C.規(guī)劃質(zhì)量管理。 D.控制質(zhì)量。 審題: 此題的關(guān)鍵字為“測試結(jié)果表明”,意思就是問題已經(jīng)發(fā)生,目前是在質(zhì)量控制過程。 定位: 監(jiān)控過程組·質(zhì)量管理·8.3 實施質(zhì)量控制 解析: 1、題干描述說明問題已經(jīng)發(fā)生,所以是實施質(zhì)量控制的過程(選項D)。 2、質(zhì)量管理由規(guī)劃質(zhì)量、質(zhì)量保證和質(zhì)量控制這三個過程組成,它本身并不是一個過程組,所以A選項不正確; 3、選項B是項目經(jīng)理做完目前工作后下一步要做的; 4、題干描述說問題已經(jīng)發(fā)生,所以C選項不對。 PMP參考答案:D.控制質(zhì)量。 |




