PMP考試試題一: Progressive elaboration is a characteristic of projects that integrate the concepts of temporary and unique in project plan development, progressive elaboration also is terms of A. Assumptions B. Constraints C. Project management information system D. Organizational policies and procedures 漸進(jìn)明細(xì)是結(jié)合了項(xiàng)目的一次性和獨(dú)特性的特點(diǎn)。編制項(xiàng)目計(jì)劃的過(guò)程中,漸進(jìn)明細(xì)在以下哪個(gè)方面也是重要的: A. 假設(shè) B. 限制條件 C. 項(xiàng)目管理信息系統(tǒng) D. 組織政策和程序 PMP參考答案:A. 假設(shè) PMP答案解析:項(xiàng)目范圍說(shuō)明書(shū)-項(xiàng)目假設(shè)條件(5.3.3.1 ) P124 PMP考試試題二: A project team is having difficulty communicating over long distances. There were 13 team members from two countries, and then five people from India were added. This is of concern to the project manager because: A. Communications channels grow rapidly. B. It will be harder to use reward power. C. Communication blockers grow linearly. D. Conflict can be increased with an increase in project priorities. 項(xiàng)目團(tuán)隊(duì)在遠(yuǎn)距離溝通上遇到了困難,13位團(tuán)隊(duì)成員來(lái)自不同的2個(gè)國(guó)家,后來(lái)又增加了5位來(lái)自印度的成員。這應(yīng)該引起項(xiàng)目經(jīng)理的關(guān)注,因?yàn)椋? A. 溝通渠道迅速增加。 B. 使用獎(jiǎng)勵(lì)權(quán)力變得更困難。 C. 溝通阻礙者以直線(xiàn)的速度增加。 D. 項(xiàng)目?jī)?yōu)先級(jí)的增加導(dǎo)致沖突的增加。 審題: 此題的關(guān)鍵字為“遠(yuǎn)距離溝通上遇到了困難”和“增加了5為成員”,題干描述遠(yuǎn)程溝通的困難和人員增加的情況。 定位: 規(guī)劃過(guò)程組.溝通管理·10.1.2 規(guī)劃溝通管理: 工具和技術(shù) 解析: 此題主要解決的是溝通人員增加帶來(lái)的溝通渠道增加的問(wèn)題,選項(xiàng)A正確。 資源的增加一般不會(huì)增加使用獎(jiǎng)勵(lì)權(quán)力(選項(xiàng)B)的難度。選項(xiàng)C的描述本身就不正確。選項(xiàng)D在題干中沒(méi)有涉及。 PMP參考答案:A. 溝通渠道迅速增加。 |