當(dāng)前位置:PMP團(tuán)購(gòu)網(wǎng) > PMP考試資料 > 正文
PMP考試每天一練--2016年P(guān)MP考試模考試題-8
|
PMP英文試題:8. In a projectized organization the project team: A. reports to many bosses. B. has no loyalty to the project. C. reports to the functional manager. D. will not always have a "home." PMP中文翻譯:8.純項(xiàng)目組織結(jié)構(gòu)中項(xiàng)目團(tuán)隊(duì): A. 向多個(gè)老板匯報(bào)。 B. 對(duì)項(xiàng)目不忠誠(chéng)。 C. 向職能經(jīng)理匯報(bào) D. 總是沒有“家”的感覺。 PMP參考答案:D PMP答案解析:組織結(jié)構(gòu)特點(diǎn)(2.1.3) P22 |




